Opportunities
An opportunity is a piece of business you’re chasing for a customer: Office refit, phase 2, 2027 supply agreement. It has a value, a likelihood of winning and an expected close date, and it collects the quotes you make for it. It ends won or lost. Each has a reference such as OPP-000123.
Find them in CRM → Opportunities on the rail.
An opportunity can start before there’s any quote, while you’re still finding out what the customer needs. It can have several quotes: options A and B, or the same job priced for different contractors. And a won one can still take more orders, for a supply deal that brings in business over time.
See your opportunities
Section titled “See your opportunities”Opportunities opens on My open: the open opportunities you own, the soonest to close first.
| Choose | Shows |
|---|---|
| My open | Open opportunities you own. |
| Unassigned | Open opportunities nobody owns yet. |
| Closing this month | Open opportunities expected to close by the end of this month, or already overdue. |
| Stalled | Open opportunities nothing has been done on for a while (see Stalled and no next step). |
| Open | Every open opportunity you can see. |
| Won / Lost | Closed ones. |
| All | Everything you can see. |
Narrow the list by pipeline, stage or owner. Open ones come first, soonest to close at the top; select a column heading to sort by it instead, or its filter icon to filter on that column. A close date in red has passed. The list shows each one’s value and weighted value, with their totals.
Columns chooses your columns, including Pipeline, Created, Contact, Source, Campaign, Primary quote, Closed and Lost reason. Export takes the list away as a CSV or Excel file: the same opportunities you can see, with the view, search and filters you’ve chosen.
You see your own opportunities and unassigned ones. Your administrator can let you see everyone’s, or manage anyone’s, through your role.
Stalled and no next step
Section titled “Stalled and no next step”Two markers show beside an open opportunity, in the list and on the board:
- No next step: it has no open task. Add a task for whatever happens next, such as a call or a meeting.
- Stalled: nothing has been done on it for 14 days or more: no edit, no stage change, no task completed and no change to its quotes. The number of days is set in CRM settings.
Its owner is also told the morning it stalls, and the morning after its expected close date passes.
The pipeline board
Section titled “The pipeline board”CRM → Pipeline shows one pipeline as a board: a column for each stage, with its open opportunities as cards, then Won and Lost columns with the ones closed in the last 30 days. Each column’s heading is an arrow in its stage’s colour, set in Set up pipelines, saying how many there are (for example Proposal / 4). Under it are their value and weighted value.
A card shows the opportunity’s name, customer, value, expected close date (red once it’s passed), owner, quotes, and the Stalled and No next step markers. Select the name to open it.
- Drag a card to another stage to move it there. You can also use the card’s menu and choose Move to.
- Drop it on Won to mark it won. If it has an open quote or enquiry, you can choose Confirm order… instead: the quote opens with its Confirm order box showing, and confirming it wins the opportunity too. With several open quotes, choose which; the primary comes first.
- Drop it on Lost to lose it. You’re asked for the reason, and whether to mark its open quotes lost too.
Choose the pipeline, owner and close dates at the top. On a phone, the board shows one column at a time: pick it from the row of coloured arrows above, which scrolls sideways.
Forecast
Section titled “Forecast”CRM → Forecast shows what’s coming in, for one pipeline and owner or for everything you can see:
- The figures at the top: what’s open (count, value and weighted value), what was won in the last 12 months, the win rate (won out of everything won or lost), and how many are past their expected close date.
- By month: for three months back to five ahead, the open opportunities expected to close in each month (value and weighted value) against what was won and lost in it.
- By owner: each owner’s open, won and lost opportunities and win rate.
- Time in each stage: how long opportunities spend in each stage on average.
- Overdue: open opportunities whose expected close date has passed, to update or close.
Once targets are set, By month has a Target column, the chart a target line, and Won shows the number won against the number targeted (for example 3 / 5). By owner compares each owner’s won value with their targets over the same 12 months. Targets cover every pipeline, so they’re left off when you choose one.
What it’s worth
Section titled “What it’s worth”- Value is the primary quote’s total, once that quote has items on it. Before that, it’s the estimated value you entered. Other quotes are alternatives, so they don’t add up.
- Likelihood comes from the stage it’s at, unless you set its own on the opportunity. Won is 100% and lost is 0%.
- Weighted value is the value times the likelihood: what it’s worth on average.
- Amounts in another currency are converted at its current rate.
Add an opportunity
Section titled “Add an opportunity”- In Opportunities, select New opportunity.
- Enter what it is (Name) and choose the Customer, and a Contact there if you like.
- Choose the Pipeline (your default one is chosen for you) and the Stage it’s at.
- Enter the Expected close date, and an Estimated value if you have one.
- It’s yours unless you change the Owner.
- Select Save.
Move it along
Section titled “Move it along”Its Details tab is a form. As soon as you change something, Save and Cancel appear in a bar at the bottom of the screen, and changed fields are highlighted. Cancel puts everything back as it was.
The stages of its pipeline run across the top of the opportunity as a path of arrows. Stages it has passed are green with a tick, the one it’s at is highlighted, and those still to come are grey. The last step, Won or lost, shows how it ended once it’s closed.
- Select a stage to move it there, forwards or back.
- Mark as complete moves it on to the next stage. At the last stage it becomes Mark as won, which opens the same box as Won.
- If you’ve changed something on the Details tab and not saved it, you’re asked to save or cancel first, so nothing you typed is lost.
On a phone, the path shows the steps without their names, with the stage it’s at and how far along that is (for example Proposal · 3 of 5) underneath.
Every move is recorded on the History tab.
When a quote for it is sent, it moves on to the pipeline’s “quote sent” stage by itself, if that’s further along.
Quotes
Section titled “Quotes”The Quotes tab lists its quotes, with their status and total.
- New quote makes a quote for it. The quote is for the opportunity’s customer unless you choose another: when several contractors are pricing the same job, each gets a quote on the same opportunity. The new quote starts with the opportunity’s owner as salesperson, its pipeline’s sales type, its contact and its source.
- Link a sale adds a quote you’ve already made. A quote can belong to one opportunity only.
- Make primary chooses whose total is the opportunity’s value. The first quote is the primary until you choose another. On a phone it’s the star beside a quote; the filled star marks the primary.
- A sale shows its opportunity at the top, with a link back to it.
Products of interest
Section titled “Products of interest”Before there’s a quote, the Products tab lists what the customer is interested in.
- In Add a product…, find the product by its code or name. It’s added with a quantity of 1.
- Change the Quantity, and the Price if you want one of your own. Leave the price empty and it’s priced for the opportunity’s customer when you save, as a new quote line would be.
- Select Save.
The tab shows each product’s value and the total. Select Make … the estimated value to use the total as the opportunity’s estimated value.
New quote to the opportunity’s customer starts the quote with these products as its lines, priced as any new line is. A quote to another customer (a contractor) starts empty.
Configured products aren’t offered here: their questions are answered on a quote.
Competitors
Section titled “Competitors”On its Details tab, Competing with lists who else is quoting for it. Choose as many as you know of. The list of competitors is set up in Administration → CRM → Competitors.
When you lose it, the box asks who it was lost to. If only one competitor is quoting, they’re chosen for you. Who won it shows on the opportunity, and they’re added to its competitors if they weren’t there.
On the Home page, a chart of Opportunity win rate split by competitor shows how often you win against each one.
Won and lost
Section titled “Won and lost”- Confirming a quote wins its opportunity. You’re then asked whether to mark its other open quotes lost, as Another option chosen.
- You can also select Won yourself, for business closed outside Customry One. If it has an open quote, the box offers Confirm order… first, as the board does.
- Lose closes it with a reason, and who it was lost to if you know (see Competitors). Tick Also mark its open quotes lost to close those too, with the same reason.
- If every quote on an open opportunity is lost, it asks whether you want to close the opportunity too. It doesn’t close it for you, because you might quote again.
- Someone who manages opportunities can Reopen a won or lost one. It goes back to the stage it was at.
Activity, tasks and history
Section titled “Activity, tasks and history”Recent activity, beside its details (below them on a narrower screen), is what’s happened, newest first: when it was opened, each stage it moved to, its quotes being added, confirmed or lost, documents sent for them, tasks done, calls, meetings and emails logged, the lead it came from, and when it was won or lost. Filter it by kind, and select Show more for older things. Select Log at its top to record a call, meeting or email that’s already happened, or to add a note: see Calls, meetings, emails and notes.
The Tasks tab lists its tasks; a task added there is also on its customer. The History tab has two views. Actions lists when it was created, each stage it moved through, and when it was won, lost or reopened, with who did it; filter it by person or action. Field changes shows every change to its details, field by field.
A customer’s Opportunities tab lists the opportunities for that customer. Columns lets you choose, move and resize its columns: see Choose your columns.
Set up pipelines
Section titled “Set up pipelines”In Administration → CRM → Pipelines:
- Add a pipeline for each kind of business you track separately, such as New business, Repeat orders or Projects. One is the default for new opportunities.
- Give each pipeline its stages, in order, each with a likelihood and a colour. Turn on Move here when a quote is sent on the stage a sent quote should move an opportunity to; only one stage per pipeline can have it.
- A pipeline can have a default sales type for the quotes made from its opportunities.
- A stage or pipeline that’s been used can’t be deleted. Make it inactive instead.
CRM settings
Section titled “CRM settings”In Administration → CRM → CRM settings:
- Win the opportunity when a linked sale is confirmed: on by default.
- New quotes ask for an opportunity: No, Offer (the new-quote screen offers a choice of opportunity) or Require (a new enquiry or quote can’t be made without one). New orders are never asked.
- Prospect customer type: the type a new customer made by qualifying a lead gets. Left empty, it’s the first type marked as for leads and not for customers (Prospect, unless you’ve changed it).
- Make prospects customers on their first order: on by default. When a prospect’s first order is confirmed, its type changes to the Customer type on first order (left empty, the first type marked as for customers).
- Qualifying makes an opportunity: whether Make an opportunity starts ticked when you qualify a lead.
- Stalled after (days): how many days with nothing done before an open lead or opportunity is marked Stalled and its owner is told. 14 to start with; 0 never marks them.
- A lead is hot at (score): the score at which an open lead shows in the Hot view and its owner is told. 50 to start with; 0 never makes one hot.